Truss Bridge in Templin

Heavy Load Bridge Crossing Channel 

Client: City of Templin

Year of construction: 2004

Dimensions:
Length: 73,70 m
Width: 4,80 m

Construction: Glue laminated timber truss construction with tiled roof

Our services: Design Engineering and structural engineering

Description:

Old tradition in a new guise. With the capacity for heavy vehicles, precisely for 12 tons heavy vehicles, this bridge has a large span. The roof protects the whole construction from weather influences and make the structure solid and durable with low costs of maintenance. Timber bridges of similar design have been under traffic for over 750 years. Long tradition of building and the concept of sustainability is what it makes original.