Client: City of Bad Mergentheim
Year of construction: 2003
Dimensions:
Length: 26,00 m (7,00/12,00/7,00m)
Width: 2,50 m
Construction: Block laminated spruce timber construction with mastic asphalt surface and steel railing
Our services: Design and structural planning
Description:
Efficient system in place: the block beam bridge spans a underlying road and can be complemented by two inclined struts. In this case, an efficient support system is well adapted to the landscape conditions. The block beam is covered with mastic asphalt and protected from weathering as well as the lateral side of the beam. Due to a low weight of the block support, the bridge could be prefabricated in the factory and installed within one day.
More projects