Client: City of Kalkar
Year of construction: 1995
Dimensions:
Lenght: 26,00 m
Width: 2,50 m
Structure: Main beam laterally covered with larch three-layer panels; topside titanium zinc sheet
Our service: consultancy timber works during refurbishment
Description:
The existing arch bridge was not sufficiently protected from weathering. To ensure protection, a lateral wooden cladding and top cover made of titanium zinc plates were installed. By these measures, the bridge is considered to be protected and prepared for many more years.
More projects